| Treatment no.: | 5.4.3.59 | 
   
     | ID no.: | 5.4.3.59 | 
   
     | Position: | Pavement | 
   | Size: | L520mm x W210mm x H180mm | 
   | Damage Condition: | Crack,Breakage, Scaling | 
   
     | Repair case: | 3+5a | 
   
   | Treatment |  | 
   
     | Specification: | Connected by: Stainless screw bolt, Ø6 mm x L 100mm x 1ps ( 50/50) | 
   
    |  | Epoxy adhesive (B7 = 15ml) +  (Sandstone Powder = 30g) | 
  
    |  | Injection: Polymer( P-2e =28g) + Cement (C-2 =30g) | 
  |  | Gap filling by: Polymer P-1c + Water + Cement + Sand + Metyl Cellulose | 
  | Date of start: | 21 Mar 2008 | 
   | Date of finish: | 31 Mar 2008 | 
   | Person in charge: | Khieu Mony & Cheam Pross | 
Copyright ©2011 JASA: JAPAN + APSARA Safeguarding Angkor. All Rights Reserved.