| Treatment no.: | 3.4.1.5 | 
| ID no.: | 3.4.1.5 | 
| Position: | Pavement | 
| Size: | L810mm x W480mm x H260mm | 
| Damage Condition: | Scaling | 
| Repair case: | 5a | 
| Treatment | |
| Specification: | Injection: Polymer( P-2e =16g) + Cement (C-2 = 10g) | 
| Gap filling by: Polymer P-1c + Water + Cement + Sand + Metyl Cellulose | |
| Date of start: | 07 Mar 2008 | 
| Date of finish: | 11 Mar 2008 | 
| Person in charge: | Khieu Mony & Cheam Pross | 