Treatment no.: | 3.3.3.6 |
ID no.: | 3.3.3.6 |
Position: | Platform |
Size: | L950mm x W460mm x H230mm |
Damage Condition: | Fragment, Scaling |
Repair case: | 1+5a |
Treatment | |
Specification: | Epoxy adhesive (B7 = 9ml) + (Sandstone Powder = 18g) |
Injection: Polymer( P-2e =28g) + Cement (C-2 = 30g) | |
Gap filling by: Polymer P-1c + Water + Cement + Sand + Metyl Cellulose | |
Date of start: | 04 Apr 2008 |
Date of finish: | 08 Apr 2008 |
Person in charge: | Khieu Mony & Cheam Pross |
Photograph Before Treatment | Photograph After Treatment |
North face | North face |
South face | South face |
East face | East face |
West face | West face |
Top | Top |
Bottom | Bottom |
Oblique | Oblique |
Oblique | Oblique |