Treatment no.: | 1.4.10.52 |
ID no.: | 1.4.10.52 |
Position: | Pilaster |
Size: | L650mm x W300mm x H270mm |
Damage Condition: | Fragment, Scaling |
Repair case: | 1+5a |
Treatment | |
Specification: | Epoxy adhesive (B7 = 7.5ml) + (Sandstone Powder = 15g) |
Injection: Polymer( P-2e =28g) + Cement (C-2 = 30g) | |
Gap filling by: Polymer P-1c + Water + Cement + Sand + Metyl Cellulose | |
Date of start: | 07 Sep 2007 |
Date of finish: | 12 Sep 2007 |
Person in charge: | Khieu Mony & Cheam Pross |
Photograph Before Treatment | Photograph After Treatment |
North face | North face |
South face | South face |
East face | East face |
West face | West face |
Top | Top |
Bottom | Bottom |
Oblique | Oblique |
Oblique | Oblique |