Treatment no.: | 1.2.8.2 |
ID no.: | 1.2.8.2 |
Position: | Platform |
Size: | W540mm x L110mm x H320mm |
Damage Condition: | fragment, scale, |
Repair case: | 1+5a |
Treatment | |
Specification: | Epoxy adhesive (B7 = 120ml) + (Sandstone Powder = 24g) |
Injection: Polymer( P-2e = 39g) + Cement (C-2 = 40g) | |
Gap filling by: Polymer P-1c + Water + Cement + Sand + Metyl Cellulose | |
Date of start: | 19 Set 2008 |
Date of finish: | 26 Set 2008 |
Person in charge: | Khieu Mony & Cheam Pross |
Photograph Before Treatment | Photograph After Treatment |
North face | North face |
South face | South face |
East face | East face |
West face | West face |
Top | Top |
Bottom | Bottom |
Oblique | Oblique |
Oblique | Oblique |